Skip to main content

Build Story Evidence Index

Prepared for RC2 planning · Updated February 24, 2026

This index ties architecture claims to commits, validation outputs, and visual artifacts so release reviews can verify narrative and delivery alignment quickly.

Architecture Timeline

  • 0bb549d7c (Jan 13, 2026): GTM landing production baseline and validation closure.
  • 5d4ffea7c (Feb 19, 2026): Performance page + traditional-vs-HDIM proof narrative.
  • 3e24bec9f (Feb 22, 2026): Race Track FHIR A/B validation and evidence publication.
  • 4cb1a4bd9 (Feb 22, 2026): Automated portal deployment validation workflow.
  • bb422d3c7 (Feb 23, 2026): Public care transitions pilot and portal integration.
  • f2b52c9de (Feb 23, 2026): Vercel cleanup and resilient lead API runtime behavior.

Release Point RC2 Checklist

  • Landing content + screenshot set frozen and reviewed.
  • validate:ci green in landing-page-v0.
  • Portal link audit regenerated with fresh timestamp.
  • Release note references this evidence index directly.

Read executive summary